How to Solve Long Lead Time Issues in DC Link Capacitor Sourcing
In power electronics, procurement delays from well-known capacitor brands often extend delivery from weeks to months. For manufacturers requiring a DC link capacitor short lead time, such delays can disrupt production, increase costs, and damage customer trust. Many engineering teams are now seeking an alternative to EPCOS DC link capacitor to secure reliable sourcing.
A Practical Alternative – JFQP DC Link MKP Film Capacitors
The JFQP series from jb Capacitors addresses both performance and delivery challenges. These metallized polypropylene film capacitors feature short lead times, high ripple current handling, and low ESR/ESL. With an operating range of −40°C to +105°C and voltage ratings from 500 VDC to 1200 VDC, they are suitable for DC-Link, coupling, and filtering applications.
Engineering Insight: ESR, dv/dt, and Design Life
In DC-Link circuits, low ESR reduces heat generation under high ripple currents, directly extending capacitor lifespan and system reliability. High dv/dt tolerance enables safe operation under fast transients, especially with high-speed IGBT or SiC MOSFET switches. Choosing capacitors with the right ESR, dv/dt, and thermal endurance helps ensure long-term stability and fewer maintenance cycles.
Application Examples
- Solar Inverters – maintaining stable DC bus voltage under fluctuating inputs
- Industrial Motor Drives – filtering and storage in high-load switching environments
- EV Charging Stations – ensuring efficiency and reliability in continuous operation
- High-End Power Supplies – delivering clean, stable output for sensitive systems

2 Comment so far
Leave a replyOscar | 2025-08-15 14:26:26
[Reply]
Paul | 2025-08-15 17:15:31
[Reply]